amperical.ai ERCOT BESS Revenue Leaderboard · LOWER COLORADO RIVER AUTHORITY

LOWER COLORADO RIVER AUTHORITY battery sites in ERCOT, ranked by revenue

Every ERCOT battery storage resource scheduled by LOWER COLORADO RIVER AUTHORITY as qualified scheduling entity (QSE), with its rank on the all-ERCOT revenue leaderboard. QSE names come from ERCOT's files, the scheduling entity is not always the site owner or physical operator. Window: 2026-01-01 to 2026-04-23, from public 60-day settlement disclosures.

LOWER COLORADO RIVER AUTHORITY schedules 2 battery storage sites in ERCOT as QSE, totaling 154 MW across LZ_NORTH, LZ_SOUTH. Its best ranked site is JAG_SLR_ESR1 at #42 of 298 ERCOT batteries on revenue per kW-month.

Live leaderboard · All QSEs · Methodology

All 2 LOWER COLORADO RIVER AUTHORITY sites

Ranks are global across all 298 ERCOT batteries. Exact figures on the top 20 of the leaderboard, banded ranges beyond. Your own site's exact revenue is emailed free from the live leaderboard.

RankResourceZoneQSEMW$/kW-mo$/MW-dayEnergy %Cycles/day
42JAG_SLR_ESR1LZ_NORTHLOWER COLORADO RIVER AUTHORITY100–200$3–5$75–10050–75%1–1.25
249JOHNCI_ESR1LZ_SOUTHLOWER COLORADO RIVER AUTHORITYunder 10$0–1$25–5075–100%0–0.5

Built by Amperical from public ERCOT 60-day SCED and DAM settlement disclosures.

Numbers are estimates for benchmarking, not settlement statements. Full method: how we compute ERCOT BESS revenue.